grega 0 #1 February 1, 2005 this is question for all the packers. Where do you put the excess cypress 2 cable, because jav odysseys don't really have a pocket for excess cable only a "cover" with velcro. so: -do you put the cable under that cover and try to close the cover even though the cable is between both sides of velrco -or do you put the excess cable in the same pocket the main cypress unit is in? -or do you just leave the excess cables at the botom of reserve container... ???"George just lucky i guess!" Quote Share this post Link to post Share on other sites
SkymonkeyONE 4 #2 February 1, 2005 Excess cable is coiled up and put inside the same pocket as the main unit. Quote Share this post Link to post Share on other sites
grega 0 #3 February 1, 2005 That's what i though. thanks"George just lucky i guess!" Quote Share this post Link to post Share on other sites
councilman24 37 #4 February 1, 2005 I don't think SOOOO!!! Not in any installation I've ever seen. The cables do not fold back into the pocket with the processing unit. They go under the velcro OUTSIDE the pocket! See http://www.cypres2.com/userguide/CYPRES_2_users_guide_english.pdf page 13.I'm old for my age. Terry Urban D-8631 FAA DPRE Quote Share this post Link to post Share on other sites
councilman24 37 #5 February 1, 2005 See above. I think you misinterpreted the question, I hope.I'm old for my age. Terry Urban D-8631 FAA DPRE Quote Share this post Link to post Share on other sites
grega 0 #6 February 1, 2005 well yeah i'm used to put the excess calbe outside under the velcro pocket. but the odyssey doesn't have a pocket. well it does but... well if you put anything in that so called pocket, you can't close it because the cable will prevent the two velcro sides to hook together. it't not the same pocked as at mirage, wings, atoms, ... it's more just a cover than a pocket to put cables in. so if you fold them and put them under that cover ("pocket") they'll unfold very easily. unless i hold them there where they are supposed to be and then put the freebag in so it'll hold the cables in place. but i doubt it was designed for packing this way... and i sure rather put them in the same pocket as the main unit is, than to be in doubt wheather cables unfolded and are really close to the lines... hmm... thanks for the link but in cypress manual sais put the excess cable in the outside velcro adjustable pocket. and if there isn't any "pocket" "George just lucky i guess!" Quote Share this post Link to post Share on other sites
bliston 0 #7 February 2, 2005 I assume that you are talking about the cypres pocket that doesn't provide space to coil the excess. A much better solution is to make a long "s-fold" with the thick cable that runs to the control unit and insert it into the channel that runs from the base of the container toward the yolk. Then all you have is the thin cable that runs to the cutter to stow at the base of the container. I make a circle with the field replaceable link under the flap and the velcro closing in the middle of the circle. I got permission from RWS to do this on their containers. Be sure to get something in writing from Sunpath before doing anything other than what their manual states (this, of course, is a good rule of thumb to live by anytime you are considering doing something that is in any way different than what's presented in the manual). BenMass Defiance 4-wayFS website sticks! Quote Share this post Link to post Share on other sites
councilman24 37 #8 February 2, 2005 I may not have seen an odessey, but I have seen smaller rigs without the full outside pocket. There was still enough room to put the cables under the velcro and close it. Also, at least one manufacturer, I don't remember who, has the s fold in the channel in the manual. But I still think that folding the cables back on themselves into the processor pocket is a bad idea and not one I've ever seen sanctioned. I'd appreciate the link if someone has one where this is the recommended procedure.I'm old for my age. Terry Urban D-8631 FAA DPRE Quote Share this post Link to post Share on other sites
AirtecKai 0 #9 February 2, 2005 Hello Gregor, Sun Path has issued a Service Bulletin regarding the cable storage. Please have a look at the attachment. Best regards, Kai Quote Share this post Link to post Share on other sites
councilman24 37 #10 February 2, 2005 I stand corrected. I don't believe I've ever seen that service bulletin. Hmmmm.I'm old for my age. Terry Urban D-8631 FAA DPRE Quote Share this post Link to post Share on other sites
Hooknswoop 19 #11 February 2, 2005 It doesn't say it is a SB and it isn't listed on Sun Path's web site under SB's. I need to double check the date, but I think it says 29 January, 2005. Derek Quote Share this post Link to post Share on other sites
councilman24 37 #12 February 2, 2005 It's dated January 2004 but I don't know how we were supposed to see it. I seem to remember seeing part of it somewhere. But the manual online has nothing about cypres installation.I'm old for my age. Terry Urban D-8631 FAA DPRE Quote Share this post Link to post Share on other sites
riggerrob 643 #13 February 2, 2005 Thanks for posting the SB. This is the first time I have seen it. Solution number 2 also applies to Talon 2s and other Rigging Innovations products. Quote Share this post Link to post Share on other sites