I would never pack a reserve with an expired AAd or with expired batteries but , if the deadline is still relatively long due (we have 180 days repack cycle here) I will notify the customer and if it is shortly due, I will call him before repack.
Anyway a factor on which I have no control is the number of jumps made with the batteries set : how can I be sure that the jumper will cross the 500 jumps mark before the legal expiration date ? So if ever I only accept to pack reserves when I am 100 % sure that at the expiration dates all the conditions will be fulfilled, I have no other solution than looking for another job as I will never be sure that the rig, in 6 months time will not have made the 500 jumps.
You can post now and register later.
If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.
Anyway a factor on which I have no control is the number of jumps made with the batteries set : how can I be sure that the jumper will cross the 500 jumps mark before the legal expiration date ? So if ever I only accept to pack reserves when I am 100 % sure that at the expiration dates all the conditions will be fulfilled, I have no other solution than looking for another job as I will never be sure that the rig, in 6 months time will not have made the 500 jumps.
JPD
Share this post
Link to post
Share on other sites